The programming skills of the tester may be flawed

The programming skills of the tester may be flawed.The best possible testing procedure may not be identified by the conductor. Dynamic object handling issues. Upgradation of AUT (application under test) or utilizing the same in different OS may require engineering skills. i. Similar efforts may also be needed during upgradation of tool to a more advanced version. d. Professionally trained people may be lacking. The person performing the test may not be having adequate knowledge about the same. Third party tools and other control features necessary to perform the test smoothly may be missing. Time based scenarios should be taken into consideration. e. Automations test or domain knowledge might be inadequate. g. As the tests will be conducted by machines, they will have certain limitations.

AUT might be built on other OS or newer version of the OS. Before beginning the test, you need to set the criteria for the same. h. These are some of the major challenges that can be faced in automation testing apart from certain management issues like indecision and the delaying in approval of the test tools which are a whole different issue. The test conductor may have a rigid mindset where he refuses to adapt latest techniques. c. Necessary patches, plug-ins or add-ins may be missing when needed. h. d. Challenges from Automation Engineers; Front: a. Challenges from Tools Front: a. A flexible framework design and its implementation may not be available. We offer both test automation consulting High Frequency Induction Welding Equipment Manufacturers; maintenance.

The vendor may not provide you with enough support to conduct the tests. d.Challenges from Test Cases Pack Front: a. There might be challenges regarding Object Repository Maintenance. Training of the engineer may not be proper. The tools you have selected may be inappropriate for the test being conducted. The tools which are required by you on a particular test phase may be unavailable. b. You need to manually assess the feasibility of the test well before you can actually begin the procedure in order to prevent time wastage. Challenges from Framework Front: a. c. # ZenQ has proven experience in providing efficient and reliable test automation solutions. With the aging of the tool, it may be required to engineer it to make it perform the desired functions. Application may be unavailable

Unavailability of online forums and support may cause problems with the tool operation. f. Challenges from AUT Front: a. Multiple interface issues. f. Various Frameworks and their proper implementation may not be known by the tester. g. A process oriented approach to testing process may be lacking. During the occurrence of the test, you need to do proper documentation of the expected results so as to compare them with the obtained ones. d. c. Implementation of handling and figuring exceptional cases may be missing. b

0コメント

  • 1000 / 1000